HP HP0-Y23 最新題庫資訊

HP0-Y23 Exam
Deploying HP ProCurve Products
Exam Number/Code : HP0-Y23
Exam Name : Deploying HP ProCurve Products
Questions and Answers : 65 Q&As
Update Time: 2010-06-18

Killtest gives your best reparation about HP HP0-Y23 exam. HP HP0-Y23 certification

set the standards for networking skills and develops with the IT industry. The HP0-

Y23 training  is bound to valid, fair and highly classed exams to prepare. All

candidate would have the option to choose the track in HP0-Y23  that which

combination of exams would be suitable for them.

1. What can be used as a destination when backing up the configuration on an HP

ProCurve 3500yl switch? (Select two.)
A.TFTP server
B.compact flash
C.neighboring switch
D.USB flash drive
E.FTP server
Answer: AD
2. You must configure an HP ProCurve 3500yl switch for installation in a network

that uses RSTP to form a single-instance Spanning Tree. What must you do to ensure

that the 3500yl will participate in this Spanning Tree?
A.Enter spanning-tree in the global configuration context.
B.Enter spanning-tree rstp in the configuration context for every VLAN the switch

shares with another
switch.
C.Enter spanning-tree protocol-version rstp in the Spanning Tree configuration

context.
D.Enter spanning-tree autodetect in the configuration context of every port where

the switch will hear
Spanning Tree BPDUs.
Answer: A
3. Which options are available at the following prompt in the CLI of an HP ProCurve

3500yl switch?(Select three.)3500yl-24G#
A.enable IP routing
B.update switch software
C.disable ports
D.erase startup configuration
E.define management passwords
F.restart the switch
G.assign IP address to VLAN interface
Answer: BDF

Killtest 新版CCNP 642-832考題

CCNP認證考試將會在今年發生重大改變。
新版CCNP認證考試::642-902、642-813和642-832
過渡期依然可以參加舊版CCNP考試,新版CCNP642-832正在測試階段!在2010年4月26日前預約過舊版的NP考試的需要在2010年7月31日前考掉,新版NP 主要是ISCW和ONT 在7月31日後此兩科無效,必須要考TSH007 (新版的CCNP考試)CCNP Exams Recommended Training
詳情請點擊 新版思科CCNP介紹
Killtest首先推出642-832考題,保證考生一次性通過考試,否則全額退款

Oracle 1Z0-042 考題5.20發生更新

Killtest題庫網1Z0-042考題發生更新,考題由原來的136題變為148題,考試版本為V9.02。
Killtest 題庫網保證你一次性通過1Z0-042考試,否則全額退款。
我們還免費提供1Z0-042的DEMO下載:PDF 電子檔案DEMO版本

部份1Z0-042考題如下:
1. In your Oracle 10g database , you have scheduled a job to update the optimizer statistics at 05:00 pm every Friday. The job has successfully completed. Which three pieces of information would you check to confirm that the statistics have been collected? (Choose three.)
A. average row size
B. last analyzed date
C. size of table in bytes
D. size of table in database blocks
E. number of free blocks in the free list
F. number of extents present in the table
Answer: ABD
2. You are in the middle of a transaction and very crucial data has been modified. Because of a hardware failure, the instance has shut down before synchronizing all the database files. Which two statements are true? (Choose two.)
A. On startup, SMON coordinates instance recovery.
B. On startup, CKPT coordinates instance recovery.
C. On startup, use RMAN to perform instance recovery.
D. Uncommitted changes will be rolled back after the database is opened.
E. On startup, perform media recovery and then instance recovery.
F. On startup, all the files will be synchronized and you get both committed and uncommitted data.
Answer: AD
3. You are using the backup scheduler in Enterprise Manager (EM) to schedule a backup of yourdatabase. Which type of script does the backup scheduler generate?
A. SQL script
B. PL/SQL script
C. Operating System (OS) script
D. Enterprise Manager (EM) script
E. Recovery Manager (RMAN) script
Answer: E